top of page
birdjackson018

Step by Step process of contaminated land risk assessment

With rail improvements as well as restoration nationwide, railway engineering along with construction is a big part of industry. Due to the history of railway land as well as the activities carried out on it, there is a risk of encountering contamination of land during – and even after – these works. If you are looking for contaminated land investigation NSW, consider hiring Sydney Environmental.


Sources of contamination of land often stem from current or else historical on site activities such as fuel storage space as well as handling, waste disposal, annihilation, chemical processing etc. In addition, off site contamination of land can affect a site via migration as a liquid, gas or else vapours as well as sometimes as windblown contaminated dust.


The investigation as well as remediation process is typically split into four separate phases:


Desk Study and Site Survey

A beginning contaminated land risk assessment is required to gain a good understanding of the site’s history, setting as well as potential to be affected by contamination. A contaminated land statement can embrace desk study investigate, consultation with the Local Authority as well as a field reconnaissance survey.

Contaminated Land Risk Assessment
Contaminated Land Risk Assessment

Our desk study survey work shows how a site survey exposed confirmation of past contaminative movement on a planned agricultural development.

Intrusive Investigation

If the desk study indicates probable for contamination, an invasive site examination and refined risk evaluation will be required. This will establish whether there are any improper risks to people, property or else the environment.


The type of work requisite depends on the information offered by the contaminated land report. This can range from a straightforward soil sampling exercise using hand dug pits to borehole drilling, soil testing and groundwater as well as gas monitoring.


Remediation

If the disturbing investigation identifies any improper risks, then remediation or else mitigation measures may be obligatory to facilitate a development project to proceed. Remediation engrosses the clean-up of a site to make sure that it is safe and appropriate for use.

3 views0 comments

Comments


bottom of page